Present progress of construction

The excavation of 20,000 cft of rock at the temple site has been completed.As per vastu a bore well in the North-East corner of the temple site has been drilled and got water at a depth of 35 ft of boring.However,drilling was done to a depth of 200 ft. Navagraha puner pratishstapna was done at its new location.Meditation hall structure has been completed along with ramp for the persons who can not climb the stairs.Please refer to the photo gallery for details.