Cost of the proposed project
The proposed temple construction cost is estimated at INR 2.75 Crores. The entire temple will be constructed by using Sira granite stone with intricate sculpture work The cost break down of major components of the temple are given below:
  1. Main Garbha gudi for Lord Mahashiva  INR 12 Lakhs.
  2. Garbha gudi for Lord Mahaganapathi and Lord Subramanya INR 20 Lakhs
  3. Garbha gudi for Goddess Parvathi, Lord Anjaneya (Hanuman) and Goddess Durga Devi INR 18        Lakhs ( 6 lakhs each)
  4. Pillars with intricate sculpture work INR 7.2 Lakhs.( 12 numbers each costing INR 60,000)
  5. Main Prayer hall with roof INR 12.8 Lakhs
  6. Meditation hall INR 10 Lakhs
  7. Navagraha INR 15 Lakhs
  8. Dwajasthambha INR 5 Lakhs
  9. Excavation of rock,bore well,clearing up of entire area,electrical work and fittings,plumbing,sump for rain water harvesting, pump sets for bore well and for pumping out rain water from the sump,flooring for the entire temple and other miscellaneous work INR 50 Lakhs
  10. Perimeter stone wall for the temple INR 25 Lakhs.
  11. Maha dwara and Rajagopura INR 25 Lakhs.
  12. Prayer hall for Lord Satyanarayana and Goddess Mahalakshmi INR 50 Lakhs.
  13. Construction of Sri Sai Baba Sanidhi INR 25 Lakhs.